Skip to content
POLICY BRIEF · 17 OCTOBER 2026

Lessons for the UK

Lessons for the UK from 25 other pandemic strategies.

BioR policy brief for UK policy officials and parliamentarians. Prepared for the benchmark at strategy.bior.tech, 17 October 2026. Evidence cut-off 13–16 October 2026.

The UK's March 2026 Pandemic Preparedness Strategy: Building Our Capabilities is among the most evidence-rich of the 26 strategies BioR compares. It also shows most clearly a gap common to nearly all of them. It cites a worst case of 840,000 deaths and sizes nothing from it. It dates 68 actions but reports on none of them individually. Almost every lesson below already works somewhere else. Three have no full precedent yet: no strategy yet logs changes to its action dates (R1), no jurisdiction has shown a plant converting to surge production (R16), and none publishes staffed, drill-verified critical-care surge (R24), though Japan and Italy come closest. Most cost little, and several fit before the first deadline, 31 March 2027.

No benchmark score is changed by this page. The brief draws on the five comparative analyses and the bird flu stress test.

One-page summary: ten recommendations

Almost every lesson already works somewhere else: 21 of the 24. R1, R16 and R24 have no full precedent yet. 12 of the 24 detailed recommendations are quick wins, before 31 March 2027.

  1. 1.Publish a delivery ledger for all 68 actions by 31 March 2027: lead, original date, status (including "not started") and a log of date changes, updated yearly with the Biological Security Strategy report and laid before Parliament.

    Works in: New Zealand, SpainTiming: Quick winDetails: R1

  2. 2.Restart the six-monthly Inquiry updates and adopt a reply-and-close-out rule, so every Inquiry or audit finding gets a dated answer and a formal closure.

    Works in: Denmark, EU; Scotland and Wales already publishTiming: Quick winDetails: R2

  3. 3.Write approval-or-lapse rules and sunsets into the draft All Pandemic Hazards Bill and the Civil Contingencies Act review, both due March 2027, revisiting the response to Inquiry Recommendation 15.

    Works in: Denmark, Sweden, SingaporeTiming: Quick winDetails: R4

  4. 4.Show the arithmetic from scenario to capability: for the worst case and one non-respiratory scenario, publish critical-care, PPE, testing and vaccine demand against capacity, or say why a number cannot be derived.

    Works in: ItalyTiming: Medium; 2028 review at the latestDetails: R8

  5. 5.Define a UK countermeasure clock (days, doses, what it assumes and excludes) and test Harwell's conversion to pandemic output.

    Works in: South KoreaTiming: MediumDetails: R9, R16

  6. 6.Publish stockpile fill rates against target every year, starting with PPE under Action 3a (due March 2027).

    Works in: Taiwan, DenmarkTiming: Quick winDetails: R13

  7. 7.Put detection on a permanent footing: date the 30-site metagenomics target, give metagenomics and wastewater a standing mandate and recurring funding, and report a 7-1-7 style speed measure.

    Works in: Switzerland, EU, NigeriaTiming: Medium; Spending ReviewDetails: R14, R15

  8. 8.Build an equity method into the at-risk framework review due March 2027: analyse-adapt-monitor steps, named groups, ethnicity and disability data, and a link to sick pay.

    Works in: Switzerland, New Zealand, Brazil, FinlandTiming: Quick win for method; medium for data and fundingDetails: R17, R18, R20

  9. 9.Take three bird flu (H5N1) steps before March 2027: publish the antiviral stockpile's size and coverage, set operational escalation triggers in the CONOPS review, and offer H5 vaccine to highly exposed farm and poultry workers (R21–R23).

    Works in: Japan, Taiwan, Israel; Korea, Brazil; Finland, CanadaTiming: Quick winDetails: R21, R22, R23

  10. 10.Commit to staffed critical-care surge, adult and paediatric: publish how many staffed adult and paediatric critical-care beds can open within two weeks, who would staff them and the trigger that opens them, bring Action 13g forward from 2028–30, and test the plan in an exercise (R24).

    Works in: Japan and Italy come closest; none yet does it in fullTiming: MediumDetails: R24

How to read this brief

"UK strategy p.X" is the printed page of the DHSC strategy PDF (opens in a new tab). "Action 4a" means outcome 4, action (a). The 12 principles (pp.3–11) apply UK-wide. The goals, outcomes and actions (pp.12–68) apply to England only. Parts 1–5 are BioR's comparative reports, summarised in the synthesis. The H5N1 stress test is a separate BioR scenario test of the same 26 strategies. Inference marks BioR's own judgement.

What the UK already does well

A fair comparison starts with the UK's strengths, which are real.

On the benchmark the UK totals 41 of 50: governance 3, transparency 4, equity 4. See the UK guide and how we score.

Recommendations at a glance: practice, UK gap, where it fits, timing

Gap ratings: none means the UK already does this; partial means some elements are present; full means the UK does not do this at all. Timing: quick win means before 31 March 2027; medium means 2027–28; long means 2028–30 or later. The table scrolls sideways; the number column stays in place. Select a number for the full recommendation.

24 recommendations for the UK: the practice and where it works, what the UK does today and the size of the gap, where it fits in the UK, and the timing (quick win before 31 March 2027, medium 2027–28, long 2028–30 or later)
#Practice (where it works)UK today and gapWhere it fits in the UKTiming
R1 Itemised, dated ledger with honest status (NZ, Spain) and a log of date changes (no one yet) 68 actions in three time bands; owners in the narrative only; "existing mechanisms" (pp.16, 62)Partial gap "Next steps and implementation" (p.62); BSS annual report; laid before Parliament Quick win
R2 Duty to reply to findings and formal close-out (Denmark, ECDC Art. 8) Inquiry responses on time; Module 1 six-monthly updates lapsed after 8 Jul 2025; no NAO audit of the strategyPartial gap Covid Inquiry module responses; final reports due 2027 (p.67) Quick win
R3 Governed update cycle (Switzerland two-yearly; Japan annual follow-up) One review in 2028 (pp.67–68); no cyclePartial gap 2028 review Quick win to commit; first cycle 2028
R4 Approval-or-lapse and sunsets for emergency powers (Denmark, Sweden bill, Singapore) Rec 15 safeguards declined; CCA review due Mar 2027Partial gap Action 4a, draft All Pandemic Hazards Bill (p.30); CCA review (M2 Rec 16) Quick win
R5 Consultation with a published response note (Denmark, Sweden, Switzerland) No public consultation described; intends to "consult Parliament" on the draft bill (p.30)Full gap Action 4a; 2028 review Quick win / medium
R6 Time-limited release of scientific advice (NZ, reported) SAGE papers "as and when appropriate"Full gap M2 Recs 3–4, due 2026 Quick win
R7 Devolved governments' role set by rule, not discretion (Swiss revision) COBR invitations at the Chair's discretion; devolved advisers attend SAGE as observersPartial gap Action 2b, CONOPS review (pp.24–25); Action 4b (pp.30–31) Medium
R8 Scenario demand compared with capacity thresholds (Italy) Worst case cited once (p.4); PPE sized to unnamed scenarios with no volumes (p.27)Full gap Actions 13g (p.54), 3a (p.28), 1b (p.23); 2028 review Medium
R9 A defined countermeasure clock (Korea) No UK day target; "strong advocate" of the 100 Days Mission (p.38)Full gap Actions 8c (p.40), 9b (p.42) Medium
R10 Escalation tied to health-system capacity (Korea) Three-phase figure (p.9); "transition points" left to the CONOPS review (p.25)Partial gap Actions 2b (p.25), 5c (p.33), 13g (p.54) Medium
R11 Published threat-prioritisation method (EU) "Priority pathogen families" named, method not published (p.40)Partial gap Action 8b (p.40); 2028 review Medium
R12 Unfunded share published (Indonesia); funds released against verified delivery (Italy) "Around £1 billion" envelope, no line items (p.16)Partial gap Spending Review; BSS report Medium
R13 Stockpile fill rates published (Taiwan, Denmark) PPE targets updated, volumes and fill unpublished (p.27)Full gap Actions 3a (p.28), 9a (p.42); BSS report Quick win
R14 Standing mandate for emergency-built surveillance (Swiss Eawag; EU Art. 17) Metagenomics "3-year funded" (p.47); 30-site target undatedPartial gap Actions 11a, 11d (pp.46–48); Spending Review Medium
R15 A detection-speed measure (Nigeria, 7-1-7) 7-hour diagnosis reported; no timeliness targetPartial gap Action 12a (p.49), due Mar 2027; BSS report Medium
R16 Capability verified by test, not by announcement (Part 3 rule) Harwell pandemic output untested; spring-2026 platform-trial award not foundPartial gap Actions 1c (pp.23–24), 8a (pp.39–40), 9c (p.43) Medium
R17 Analyse, adapt, monitor equity method (Switzerland) At-risk framework review due Mar 2027 (p.26); statutory child-rights impact assessment declinedPartial gap Actions 2f (p.26), 5d (p.34) Quick win
R18 Named groups and disaggregated data (NZ, Brazil) No "ethnic", "disab", "migrant", "homeless" or "prison" in the textFull gap Actions 12a (p.49), 11b (p.47), 2f (p.26) Medium
R19 Funded entitlements or targets for named groups (Thailand, Korea) No funding figure or group target; social care funding options to be evaluated 2026–27 (p.54)Full gap Actions 13f (p.54), 13b (p.52); Spending Review Medium
R20 Social protection written into the plan (Finland) Departments "will consider lessons learned" (p.18); sick pay not mentionedPartial gap Actions 5b (pp.32–33), 5d (p.34) Quick win
R21 Antiviral coverage published against target (Japan, Taiwan; Israel via its auditor) Last public figures 14.6M courses (2005) and a plan for 50% (2007); no current figureFull gap Action 9a (p.42); BSS report Quick win
R22 Influenza escalation triggers defined in advance (Japan, Korea, Brazil; ECDC alert stage) Three-phase figure (p.9); "transition points" left to the CONOPS review (p.25); rated Not readyFull gap Action 2b, CONOPS review (p.25), due Mar 2027 Quick win
R23 H5 vaccine offered to highly exposed workers (Finland 2024, Canada 2025) Poultry workers offered seasonal flu vaccine onlyFull gap JCVI and Green Book advice (Inference); the 5M+ H5 doses Quick win
R24 Staffed critical-care surge, adult and paediatric, with a number and a time to open (no jurisdiction yet; Japan's bed agreements and Italy's ICU build-out come closest) No quantified surge target; Action 13g promises thresholds and a paediatric capacity assessment for 2028–30; the 2020 surge beds were not fully staffedFull gap Action 13g (p.54), brought forward; R8 planning basis; R16 exercise Medium

Sources: other countries' practices from the synthesis, Parts 1–5 and, for R21–R23, the H5N1 stress test; for R24, the UK model run (opens in a new tab); UK status from the UK strategy and the sections below.

NEW · FROM THE BIRD FLU STRESS TEST

Bird flu (H5N1): three steps before March 2027

BioR's H5N1 stress test runs one scenario through all 26 strategies. Avian influenza A(H5N1) clade 2.3.4.4b spreads between people abroad, imported cases arrive 3–6 weeks after the first alert, and a strain-matched vaccine takes 4–6 months. The first wave would therefore be fought with antivirals, small pre-pandemic stocks, hospital surge and public-health measures. No jurisdiction is rated Ready. The UK sits in the second of four groups, "partly ready with one standout asset" (6 of 14 on a simple tally), and its standout asset is early warning. The three steps below target the UK cells that matter most before vaccine arrives. UK details come from the stress test's Anglosphere notes (opens in a new tab).

What the UK already does well here

Three steps before March 2027

R21. Publish the antiviral stockpile size and coverage

Full gapQuick win

Where it already works
Antivirals are the only specific countermeasure available at scale before vaccine. Only three of the 26 jurisdictions publish any coverage figure: Japan (45% of the population), Taiwan (12.7% against a target of at least 10%) and Israel (16% against a 25% target, from a 2020 audit) (stress test).
UK today
The last public figures are 14.6 million oseltamivir courses in 2005, about 25% of the population, and a 2007 plan to reach 50%. No current figure was found, so the UK's antiviral cell is rated Unknown (Anglosphere notes (opens in a new tab)).
Gap
Full.
Where it fits in the UK
Action 9a (p.42) and the Biological Security Strategy report, alongside the fill rates in R13. Publish coverage as a share of the population, including paediatric formulations, against a stated clinical attack rate (25–30% in the scenario) plus prophylaxis.
Timing
Quick win.
Caveat
Coverage bands, or verification by an audit office as in Israel, avoid publishing counts. Publication may show the stock below the attack rate; every legacy target except Japan's already is.

R22. Set operational escalation triggers in the CONOPS review

Full gapQuick win

Where it already works
Japan sets up its government headquarters by law when a novel influenza is recognised. Korea has a four-level alert ladder with a worked H5N1 escalation for the first three days. Brazil's five indicator-based stages act without waiting for its emergency operations centre. ECDC's framework adds a heightened-alert stage when scenarios abroad show "signals of potential human-to-human transmission" (stress test).
UK today
A three-phase life cycle (UK strategy p.9) leaves "transition points" to the CONOPS review (p.25). No operational triggers are given, and the stress test rates UK triggers Not ready, one of four jurisdictions with Finland, Indonesia and India (Anglosphere notes (opens in a new tab)).
Gap
Full. R10 covers linking the triggers to health-system capacity.
Where it fits in the UK
The CONOPS review (Action 2b, p.25), due March 2027. Include a trigger for sustained human-to-human transmission confirmed abroad, and a pre-delegated decision package for the weeks before a WHO declaration: worker vaccination from the existing H5 stock, antiviral release rules and travel-linked testing.
Timing
Quick win.
Caveat
Every Ready trigger cell elsewhere is Ready on paper only. The CONOPS is internal, so a published summary would be enough.

R23. Offer H5 vaccine to highly exposed farm and poultry workers

Full gapQuick win

Where it already works
Finland was the first country to vaccinate exposed workers, in 2024, after its fur-farm epizootic. Canada bought 500,000 doses of Arepanrix H5N1 in February 2025, and its advisory committee (NACI) recommends them for high-risk exposure groups, in some circumstances from six months of age (stress test; Anglosphere notes (opens in a new tab)).
UK today
Poultry workers and bird handlers are offered seasonal flu vaccine only, to reduce the risk of co-infection, under Green Book and JCVI advice (HSCNI letter HSSMD 43/2024 (opens in a new tab)). The 5M+ H5 doses are reserved for human-to-human spread.
Gap
Full.
Where it fits in the UK
Inference: JCVI advice on H5 use for the most exposed groups, and the decision package in R22. Include contract culling crews and migrant workers, with multilingual communication; in Korea 76.6% of monitored exposed people were foreign nationals.
Timing
Quick win.
Caveat
Canadian uptake has been small (29 people in one Ontario health unit; a reported national total under about 500, with farm workers reportedly excluded, unverified). ECDC notes there is no real-world evidence yet on the effectiveness of zoonotic influenza vaccines.

See the full bird flu stress test for all 26 jurisdictions

NEW · STYLISED MODEL, NOT A FORECAST

What the model says: the UK in BioR's robustness model

What we did. BioR's robustness model simulates one pandemic wave and tests strategy designs across 10,000 possible pandemics, using Robust Decision Making (RDM). For this brief we gave it the UK's population (69.3 million), its critical-care capacity (about 7 adult beds per 100,000, against 10 in the model's generic country, and fuller) and its countermeasures, then ran seven UK designs through the same 10,000 futures (UK model report (opens in a new tab)). "As is" counts only what has been delivered. The other designs add the UK's dated commitments, this brief's recommendations, or the elements of the model's most robust generic design: pre-agreed switches, staffed surge and a trigger linked to ICU occupancy.

Read this first

  • An exploratory, stylised model, not a forecast or an official estimate. It has one national population in three groups, a single wave and an influenza-like illness. Its death numbers show how designs compare across many futures. They are not predictions of UK deaths and are not comparable with National Risk Register or UKHSA figures. Shares of futures are shares of a sampled range, not probabilities.
  • "Commitments delivered" is a generous design. It assumes the CONOPS review produces numeric triggers linked to critical-care capacity and that Harwell converts to pandemic output as claimed. Neither is promised in that form.
  • The antiviral stock is an assumption. No current figure is published (R21), so the model assumes 25% of the population, from the 2005 purchase, and also tests 10% and 50%. Within the model's range of antiviral effect, the stock size barely changes robustness.
  • Earlier triggers without staffed beds can make outcomes worse. A lower, pre-agreed trigger on its own (UK-E1, the R21–R22 design) almost doubles the share of futures meeting the health criterion but raises the failure share from 74% to 76%. Earlier measures flatten the wave but stretch it out, so more futures exceed 60 days of ICU overload. Triggers need staffed surge behind them.
  • Validation is order-of-magnitude only. Against the UK's first COVID-19 wave the model gets deaths right in order of magnitude but overstates the ICU peak about three times. It is about 6–7 times too pessimistic for a mild pandemic like 2009. The reference figures were checked against primary sources on 17 October 2026; one correction (a ventilation-bed peak that was the UK's, not England's) changed no conclusion.

What it found

  1. The UK as it stands is fragile. The "as is" design meets the health criterion (deaths at or below 100 per 100,000 and no more than 14 days of ICU overload) in 5% of futures and fails (deaths above 200 per 100,000 or more than 60 days of overload) in 74%. It fails in most futures where the infection fatality ratio is above about 0.12%, however transmissible the pathogen. The UK's smaller, fuller bed base accounts for 7–10 points of failure; most of the gap to the best design comes from choices the UK can change.
  2. Delivering the UK's own commitments on schedule helps, but not much. The health criterion is met in 12% of futures instead of 5%, and the failure share barely moves (74% to 71%). The commitments are mostly about process (thresholds, plans, assessments), not staffed beds or pre-agreed actions.
  3. The most robust UK design adds three things the UK has not committed to. pre-agreed switches tied to early signposts, staffed adult and paediatric ICU surge (+100% within 14 days), and an escalation trigger linked to ICU occupancy. It meets the health criterion in 27% of futures and fails in 52%, and in 9 futures out of 10 it is within 5 deaths per 100,000 of the best UK design. Adding all the commitments on top changes almost nothing.
  4. In bird flu (H5N1) futures the binding constraint is paediatric intensive care. In the 141 futures that match the stress-test scenario, the UK as is fails in 84%, with its commitments delivered in 60%, and with the three additions in 10%. Staffed surge alone does not save children (63% fail): even doubled, paediatric intensive care holds a few hundred patients against thousands. The paediatric switch does: schools join the measures, PICU expands and children come first for vaccine.
  5. The model rewards pre-agreed decisions and staffed beds, not plans to develop them. Added alone to the UK as is, signpost switches add about 10 points to the health criterion, staffed surge about 6 and CONOPS triggers linked to capacity about 4. A tested Harwell conversion barely moves the criterion but cuts average deaths by about 20 per 100,000. The 30-site metagenomics, the paediatric assessment and a verified antiviral stock each add under 1 point. Their value lies where this model cannot look: non-influenza threats and accountability.
Three-panel bar chart of the seven UK designs across 10,000 futures. Share of futures meeting the health criterion C1: UK-C 27%, UK-F 27%, UK-B 12%, UK-D 11%, UK-E2 10%, UK-E1 10%, UK-A 5%. Share meeting C2, health and society: UK-C 8%, UK-F 8%, UK-B 8%, UK-D 8%, UK-E2 7%, UK-E1 5%, UK-A 4%. Failure share, lower is better: UK-C 52%, UK-F 52%, UK-B 71%, UK-D 61%, UK-E2 72%, UK-E1 76%, UK-A 74%. Dashed lines mark the generic adaptive design A1 in the model's generic country.
How often each UK design meets the health criterion (C1) and the health-and-society criterion (C2), and how often it fails, across 10,000 futures. The table below holds the same shares. Dashed lines on the chart mark the generic adaptive design A1 in the model's generic country of 10 million: C1 32%, C2 10%, failure 45% (see robust strategy design). Open the full-size chart

Seven UK designs across 10,000 futures. C1 is the health criterion and C2 adds a limit of 60 days of contact reduction and school closures. Failure means deaths above 200 per 100,000 or more than 60 days of ICU overload. Regret is the gap in deaths to the best of the seven designs in each future. H5N1 futures are the 141 in the stress-test region (R0 1.5–1.8, IFR 0.3–1.3%, severe illness in the young, vaccine at 4–6 months).

Seven UK designs across 10,000 futures
DesignC1: health criterion metC2: health and society metFailure shareMedian deaths per 100k90th-percentile regret (deaths per 100k)Failure share in H5N1 futures
UK-C UK plus the adaptive design's elements (switches, staffed surge, capacity trigger)27.0%8%52%112510%
UK-F Everything combined (UK-B plus UK-C's elements and R21–R22)26.9%8%52%1121110%
UK-B Commitments delivered on schedule11.6%8%71%16318460%
UK-D Staffed ICU and PICU surge only11.5%8%61%18121463%
UK-E2 Capacity-linked escalation and tested Harwell (R9, R10, R16)10.0%7%72%16318365%
UK-E1 Bird flu steps: verified antivirals and pre-agreed triggers (R21, R22)9.9%5%76%17922477%
UK-A As is (October 2026)5.2%4%74%19123284%
Paired bar chart of nine UK elements: the change in the share of futures meeting C1, in percentage points, when each is added alone to the UK as is, and when each is removed alone from the combined design. Pre-agreed signpost switches (severity, growth, paediatric): +9.8 pp added, 8.2 pp lost when removed; Staffed adult and paediatric ICU surge, +100% within 14 days: +6.3 pp added, 6.6 pp lost when removed; CONOPS triggers linked to critical-care capacity (Actions 2b, 13g): +4.2 pp added, 2.7 pp lost when removed; Harwell conversion tested (Action 8a): +0.2 pp added, 2.3 pp lost when removed; Revised surge plans and paediatric assessment (Action 13g): +0.8 pp added, 0.7 pp lost when removed; Pre-declaration decision package: 0.0 pp added, 0.7 pp lost when removed; 30-site metagenomics (Action 11d): +0.7 pp added, 0.0 pp lost when removed; Faster vaccine rollout (1% to 1.5% a day): 0.0 pp added, 0.1 pp lost when removed; Published, verified antiviral stock: 0.0 pp added, 0.0 pp lost when removed.
Which UK elements matter: add-one and drop-one tests across 10,000 futures. Committed elements are dated actions in the March 2026 strategy. The table below holds the same changes, with the effect on bird flu (H5N1) futures. Open the full-size chart

Which elements matter. Each element was added alone to the UK as is (UK-A) and removed alone from the combined design (UK-F), across all 10,000 futures. "Committed" means a dated action in the March 2026 strategy. pp means percentage points of futures.

Which UK elements matter: add-one and drop-one tests
ElementStatusC1 change, added alone to UK-AC1 lost, removed alone from UK-FH5N1 failure change, added aloneRecommendation
Pre-agreed signpost switches (severity, growth, paediatric)Not committed+9.8 pp8.2 pp−55 ppR22, R10
Staffed adult and paediatric ICU surge, +100% within 14 daysNot committed+6.3 pp6.6 pp−21 ppR24 (new)
CONOPS triggers linked to critical-care capacity (Actions 2b, 13g)Committed+4.2 pp2.7 pp−11 ppR10, R22
Harwell conversion tested (Action 8a)Committed+0.2 pp2.3 pp−6 ppR16, R9
Revised surge plans and paediatric assessment (Action 13g)Committed+0.8 pp0.7 pp−1 ppR8, R24
Pre-declaration decision packageNot committed0.0 pp0.7 pp−1 ppR22
30-site metagenomics (Action 11d)Committed+0.7 pp0.0 pp+1 ppR14, R15
Faster vaccine rollout (1% to 1.5% a day)Not committed0.0 pp0.1 pp0 pp—
Published, verified antiviral stockNot committed0.0 pp0.0 pp0 ppR21

What it means for the recommendations

R24. Commit to staffed critical-care surge, adult and paediatric

Full gapMedium

Where it already works
No jurisdiction publishes staffed, drill-verified surge capacity, and none publishes paediatric ICU bed counts (Part 3; stress test). Japan comes closest: it has secured 49,179 beds by agreement with hospitals against a target of 45,681, sized to COVID and not drilled. Italy publishes ICU saturation thresholds and is building 8,679 ICU beds. BioR's UK model run adds the evidence the comparison lacked: staffed surge is the second most valuable element for UK robustness.
UK today
No quantified surge target (UK strategy pp.43–44, 54). Action 13g promises "standardised thresholds" for critical care and to "assess the need for additional paediatric capacity", in 2028–30. In 2020 England added 2,711 ventilation-capable beds (+53%), but staffing ratios were diluted and the Nightingale hospitals treated few patients for lack of staff.
Gap
Full.
Where it fits in the UK
Action 13g (p.54), brought forward from 2028–30 and published with the R8 arithmetic: how many staffed adult and paediatric critical-care beds can open within two weeks, who would staff them, and the trigger that opens them (R10). Test the plan in an exercise (R16).
Timing
Medium.
Caveats
The model's +100% within 14 days is a lever value, not a costed plan. Staff take years to train, and standing surge capacity costs money every year. In the model, a 2020-style surge with only half its beds staffed raises the H5N1 failure share from 84% to 95%. Beds alone do not protect children: in H5N1 futures, staffed surge without the paediatric switch still fails in 63%.

The model is BioR's stylised system-dynamics and Robust Decision Making model; the generic version, its method and its limits are on robust strategy design. The UK run's reference figures and parameter sources were checked against primary sources on 17 October 2026 (what was checked and corrected (on GitHub) (opens in a new tab)).

Read the UK model report (opens on GitHub in a new tab)Code and result files (opens on GitHub in a new tab)See robust strategy design

The recommendations by theme

Open a theme for each recommendation in full: where it already works, the UK today, the gap, where it fits and caveats.

Design: from scenario to capabilityR8 Show the arithmetic · R9 Define the countermeasure clock · R10 Tie escalation to capacity · R11 Publish how priority pathogens are chosen

R8. Show the arithmetic

Full gapMedium

Where it already works
Italy models scenarios across a range of transmission rates (R0) and compares peak demand with about 18,000 general and 3,240 ICU beds. It labels these figures as assumptions, not forecasts, and they show the severe scenario overwhelming capacity at R0 of 1.1 or above (Part 3).
UK today
The worst case (50% ill, 1.34 million hospitalisations, 840,000 deaths) appears once, as justification (UK strategy p.4). Only PPE is said to be sized against "a range of disease scenarios", with no volumes given (p.27). Principle 4's "required levels" are never quantified (p.8). Part 3 calls this "the starkest case of decoupling".
Gap
Full.
Where it fits in the UK
Action 13g's "standardised thresholds for care" for critical care (p.54) sit in 2028–30 (p.67). Bring them forward, feed in the Pegasus report and the non-respiratory plan (Action 1b), and publish the planning basis with the 2028 review.
Timing
Medium.
Caveats
Pathogen-agnostic systems cannot be sized from one scenario; stating the reason instead is acceptable (Part 3). The underlying risk assessment is classified, so ranges may be the limit. Scenario-derived targets elsewhere are all unmet (Israel's antivirals at 16% against 25%), so publication will expose gaps. That is the point.

R9. Define the countermeasure clock

Full gapMedium

Where it already works
Korea's 100-day track assumes a prototype vaccine already has Phase 1/2 trial data. Its 200-day track assumes a similar prototype exists. Both exclude regulatory review (Part 3).
UK today
The UK launched the 100 Days Mission but sets no UK day count of its own (UK strategy pp.38–40). Harwell's "250 million doses a year in the event of a pandemic" is untested (Part 3; a government claim, not in the strategy text).
Gap
Full.
Where it fits in the UK
Action 8c (p.40) and Action 9b (p.42).
Timing
Medium.
Caveat
Korea now has only one domestic mRNA developer left, so a defined clock is not a guarantee of delivery.

R10. Tie escalation to capacity

Partial gapMedium

Where it already works
Korea sets its top alert level when spread "exceeds existing public-health and medical response capacity", not by spread alone (Part 3).
UK today
A three-phase figure (UK strategy p.9) and a planned "catalogue of policy options" rather than triggers (p.33). The UK Faculty of Public Health has asked for "pre-agreed triggers for early action" (Part 1 design report).
Gap
Partial.
Where it fits in the UK
The Concept of Operations (CONOPS) review is already to define "transition points" (Action 2b, p.25; due March 2027). Link those points to the Action 13g thresholds.
Timing
Medium.
Caveat
The CONOPS is an internal document. A published summary of the triggers would be enough.

R11. Publish how priority pathogens are chosen

Partial gapMedium

Where it already works
The EU scores 12 viral families against four published criteria, one of them climate impact (Part 1).
UK today
The strategy refers to "priority pathogen families" (Action 8b, p.40) without saying how they are chosen.
Gap
Partial.
Where it fits in the UK
Action 8b, with the full method in the 2028 review.
Timing
Medium.
Caveat
Inference: UKHSA may hold an internal list. BioR did not check whether one exists.
Delivery and reportingR1 Publish a ledger with a log of date changes · R2 Restart the Inquiry updates and close findings formally · R3 Commit to an update cycle · R12 Show what the money buys

R1. Publish a ledger with a log of date changes

Partial gapQuick win

Where it already works
New Zealand publishes a lead agency, a status and a deadline for each of 32 actions, including the ten "not yet started". Spain marks each item finished, in progress or not started (Part 2).
UK today
An "indicative" timeline in three bands (pp.62–67), assurance through unnamed "existing mechanisms" (p.62), and no progress report on the strategy itself.
Gap
Partial.
Where it fits in the UK
Publish with the March 2027 outputs, then update in the July Biological Security Strategy report (Inference: next due around July 2027). Add a log of date changes (original date, revised date, reason). No jurisdiction has one, and Part 2 found that missed deadlines are "almost never reported as missed; a new date simply appears".
Timing
Quick win.
Caveat
New Zealand's promised updates had not appeared by mid-October, so fix a publication date.

R2. Restart the Inquiry updates and close findings formally

Partial gapQuick win

Where it already works
Denmark's audit office formally closes each point against a named remedy. Under EU Regulation 2022/2371 (Article 8), countries assessed by ECDC must answer with an action plan within nine months and give reasons for any rejection (Part 4).
UK today
Whitehall's six-monthly Module 1 updates appear to have stopped after 8 July 2025, while Scotland and Wales keep publishing (Part 2). No National Audit Office (NAO) work on the strategy was found.
Gap
Partial.
Where it fits in the UK
Resume the updates now and answer the Inquiry's final reports (due 2027, p.67) in ledger form. Inference: Parliament's committees could invite the NAO to examine the strategy before 2028.
Timing
Quick win.
Caveat
The missing updates were found by search only.

R3. Commit to an update cycle

Partial gapQuick win to commit; first cycle 2028

Where it already works
Switzerland updates its plan every two years by default, with 60 days of consultation, and its first update came early, in September 2026. Japan publishes a follow-up of every plan item each year (Part 4).
UK today
One review, in 2028 (pp.67–68).
Gap
Partial.
Where it fits in the UK
Announce now that the 2028 review will set a fixed cycle. Inference, long term: the CCA review could consider a statutory duty to keep and review a plan, as in Japan and Switzerland's revision.
Timing
Quick win to commit; cycle from 2028.
Caveat
Japan judges delivery for only four numeric targets (Part 2), so a cycle needs status judgements.

R12. Show what the money buys

Partial gapMedium

Where it already works
Indonesia publishes its unfunded share by area: 13.1% overall, 81% for detection. Italy releases funds only after a committee verifies delivery, and can claw them back (Part 1).
UK today
"Around £1 billion" over the Spending Review 2025 period, with later funding "subject to future spending reviews" (UK strategy p.16). There are no line items.
Gap
Partial.
Where it fits in the UK
Next Spending Review (the date is not in BioR's inputs). Report spending by goal in the Biological Security Strategy report.
Timing
Medium.
Caveat
Italy's mechanism is untested, and its money pays for regional plans rather than the ICU beds its own thresholds show are missing. Funding for the devolved governments follows separate arrangements.
CapabilityR13 Publish stockpile fill rates · R14 Give surveillance a standing mandate · R15 Measure detection speed · R16 Verify capability by testing it

R13. Publish stockpile fill rates

Full gapQuick win

Where it already works
Taiwan reports antiviral stock at 12.7% of the population against a target of at least 10%. Denmark's audit office found PPE targets met for 6 of 7 items (Part 3).
UK today
PPE targets were updated (UK strategy p.27), and Action 3a commits to "help meet" them by March 2027 (p.28). Neither volumes nor fill levels are published. Early-2026 Inquiry evidence put the PPE stockpile below target in England, Wales and Northern Ireland (Part 3, which read only a short extract of that evidence).
Gap
Full.
Where it fits in the UK
Action 3a, then Action 9a for antivirals (p.42), reported in the Biological Security Strategy report.
Timing
Quick win.
Caveat
Publishing percentages rather than volumes avoids security concerns. Stockpile targets differ across the four nations (p.27).

R14. Give surveillance a standing mandate

Partial gapMedium

Where it already works
Wastewater monitoring has survived where a mandate made it permanent (Switzerland's Eawag reference centre; the EU's Article 17 duty) and is at risk where it ran on temporary money, as in the US, Germany and France (Part 3).
UK today
Metagenomics is a "3-year funded programme" with an undated 30-site target (pp.47–48). Wastewater work draws on £1.3 million from the Integrated Security Fund (p.46).
Gap
Partial.
Where it fits in the UK
Actions 11a and 11d (a 2027–28 action, p.66), decided at the next Spending Review.
Timing
Medium.
Caveat
The strategy does not say when the three years end. Part 3 lists it among funding cliffs to watch.

R15. Measure detection speed

Partial gapMedium

Where it already works
Nigeria uses the 7-1-7 standard operationally: 7 days to detect an outbreak, 1 day to notify, 7 days to respond. No high-income strategy adopts it. The WHO self-assessed surveillance score is saturated, with 13 of 24 jurisdictions at 100 every year from 2021 to 2023 (Part 3).
UK today
A 7-hour diagnosis time is reported for metagenomics, but there is no timeliness target.
Gap
Partial.
Where it fits in the UK
The data and modelling review (Action 12a, p.49, due March 2027) can choose the metric. Report it in the Biological Security Strategy report.
Timing
Medium.

R16. Verify capability by testing it

Partial gapMedium

Where it already works
Part 3 counts capability only when sized, verified, funded and tested. No jurisdiction has shown a plant converting to surge production.
UK today
Harwell's pandemic output is untested, and no award was found for the platform trials due "in spring 2026" (Action 8a, pp.39–40) (Part 2).
Gap
Partial.
Where it fits in the UK
A surge-conversion test in the exercise programme (Action 1c), and Action 8a's status in the ledger.
Timing
Medium.
Governance and emergency powersR4 Build approval and expiry into the powers · R5 Publish the draft bill for scrutiny, and publish what consultation changed · R6 Set a deadline for releasing scientific advice · R7 Set the devolved governments' role by rule

R4. Build approval and expiry into the powers

Partial gapQuick win

Where it already works
In Denmark, a parliamentary committee can block restrictions before they take effect. Sweden's bill, not yet in force, makes powers lapse unless the Riksdag approves them within two months, and sends each outright ban to Parliament. In Singapore, emergency declarations last up to 90 days and Parliament can annul them (Part 4).
UK today
Inquiry Recommendation 15 asked for prior parliamentary approval (draft affirmative procedure) as standard, sunsets of about two months and two-monthly reporting. The government said this "would be a matter for the governments at that time" (Module 2 response p.32 (opens in a new tab)), but agreed to review the Civil Contingencies Act's time limits by March 2027.
Gap
Partial. Civil Contingencies Act regulations need approval within 7 days and lapse after 30 (not re-checked against the statute).
Where it fits in the UK
The bill's modular design (Action 4a, p.30) allows default sunset and approval clauses per module, coordinated with the CCA review.
Timing
Quick win, since drafting closes by March 2027.
Caveat
Scotland already accepts prior approval as "the first option", and the bill must handle devolved and reserved powers (Action 4b).

R5. Publish the draft bill for scrutiny, and publish what consultation changed

Full gapQuick win / medium

Where it already works
In Denmark, Sweden and Switzerland, consultation measurably added vulnerable groups or new duties to the text, and each published what changed (Part 5).
UK today
No public consultation on the strategy is described (Part 1). The government intends to "consult Parliament" on the draft bill's provisions (p.30).
Gap
Full.
Where it fits in the UK
Action 4a, with pre-legislative scrutiny of the draft bill; and the 2028 review, with a published note of changes made.
Timing
Quick win to medium.

R6. Set a deadline for releasing scientific advice

Full gapQuick win

Where it already works
A New Zealand Cabinet circular reportedly requires key pandemic advice with human-rights implications to be released within five working days (Part 4; BioR could not open the circular itself).
UK today
SAGE papers "will be published as and when appropriate".
Gap
Full.
Where it fits in the UK
The updated guidance on publishing technical advice (Module 2 Recommendation 4, due 2026).
Timing
Quick win.

R7. Set the devolved governments' role by rule

Partial gapMedium

Where it already works
Under Switzerland's revised Epidemics Act, the federal government must formally declare a special situation and must hear the cantons and Parliament before it does (Part 4).
UK today
Devolved ministers are invited to COBR when "this decision rests with the Chair". Devolved scientific advisers attend SAGE as observers by default.
Gap
Partial.
Where it fits in the UK
The CONOPS review (Action 2b) and the four-nation crisis-communication principles (Module 2 Recommendation 17, due 2026).
Timing
Medium.
Caveat
Pandemic preparedness "is primarily a devolved matter" (UK strategy p.16), so this needs agreement from all four governments.
EquityR17 Use a method, not just a review · R18 Name the groups and collect the data · R19 Fund named groups · R20 Link sick pay to the plan

R17. Use a method, not just a review

Partial gapQuick win

Where it already works
Switzerland works in three steps: analyse who is vulnerable, adapt measures so they do not disadvantage new groups, and monitor with data and input from the groups themselves. It supports these with two dated checklists, and it assures undocumented people that their residence status will not be passed to migration authorities (Part 5).
UK today
The review of frameworks for identifying people most at risk (Action 2f, p.26) is due by March 2027. Mitigations for unequal impacts follow in 2027–28 (Action 5d, p.34). The UK declined to make child-rights impact assessments statutory and did not commit to mandatory equality impact assessments in crisis decisions (Part 5).
Gap
Partial.
Where it fits in the UK
Make the method the output of Action 2f.
Timing
Quick win.
Caveat
The Swiss measures are examples in a plan that is not legally binding.

R18. Name the groups and collect the data

Full gapMedium

Where it already works
New Zealand requires ethnicity in surveillance data and cites its own ethnic mortality ratios in the plan. Brazil tracks how completely race and colour fields are filled in on case records (Part 5).
UK today
The Race Disparity Unit report is cited in a footnote (p.3), but the text contains no "ethnic", "disab", "homeless", "prison", "migrant" or "asylum".
Gap
Full.
Where it fits in the UK
Action 12a already covers "the data needed to identify the people most affected" (p.49); add Action 11b (p.47).
Timing
Medium.
Caveat
England-only, and data protection shapes what is feasible (Action 12c, p.50).

R19. Fund named groups

Full gapMedium

Where it already works
Thailand funds a 12 million baht line for migrants and undocumented workers. Korea funded ventilation for 3,595 long-term care homes with ₩4.7bn and introduced a dedicated infection-control fee for care hospitals (Part 5).
UK today
No UK action carries a funding figure or a group-specific target. Options for funding adult social care in a pandemic are to be evaluated in 2026–27 (Action 13f, p.54).
Gap
Full.
Where it fits in the UK
Actions 13f and 13b (the adult social care action plan, due by 2027, p.52); Spending Review.
Timing
Medium.
Caveat
Thailand's sums are token and its spending is unreported.

R20. Link sick pay to the plan

Partial gapQuick win

Where it already works
Finland is the only plan that describes the quarantine and sickness allowances people can claim (Part 5).
UK today
Statutory Sick Pay reform from 6 April 2026 removes waiting days and the lower earnings limit. Part 5 relied on secondary summaries for these details. The strategy says only that departments "will consider lessons learned" (p.18).
Gap
Partial.
Where it fits in the UK
The study of wider impacts (Action 5b, pp.32–33, due March 2027) and Action 5d.
Timing
Quick win.
Caveat
Part 5 argues that a plan which does not refer to such instruments cannot test whether they will reach the people it names in time.

Timeline 2026–2028: aligning recommendations with UK deadlines

What the UK has already committed to, and which recommendations fit each deadline.

  1. Now to Nov 2026

    Committed: Scotland's combined Module 1–2 update by end November; UK Module 1 updates already missed (Jan and Jul 2026)

    Align: R2: resume UK updates

    R2

  2. By 31 Dec 2026

    Committed: Full Pegasus report ("winter 2026"); non-respiratory plan (Action 1b); Module 2 Recs 3, 4 and 17

    Align: R6 (Rec 4); R7 (Rec 17); R8 and R10 (Pegasus findings feed thresholds and triggers)

    R6R7R8R10

  3. By 31 Mar 2027

    Committed: 16 short-term actions, including the draft All Pandemic Hazards Bill (4a), powers and devolution (4b), CONOPS review (2b), at-risk frameworks (2f), PPE replenishment (3a), wider impacts (5b), data and modelling review (12a), platform trials (8a); CCA review (M2 Rec 16)

    Align: R1 (ledger with the March outputs); R4, R5 (bill and CCA); R10; R13; R15; R16; R17; R20; R21, R22, R23 (bird flu steps)

    R1R4R5R10R13R15R16R17R20R21R22R23

  4. During 2027

    Committed: Adult social care plan and test supply-chain work "by 2027" (13b, 10b); social care funding options (13f); Inquiry final reports; BSS report (Inference: around July)

    Align: R19; R2 (answer final reports in ledger form); R1 and R13 (first annual updates)

    R19R2R1R13

  5. 2027–28

    Committed: Medium-term actions, including metagenomics (11d), genomic scale-up (11c), vaccine and therapeutic access (9a, 9c), Diagnostic Accelerator (8b), unequal-impact mitigations (5d); next Spending Review (date not in inputs)

    Align: R11, R12, R14, R18; R9 preparation; R24 (bring the 13g surge plans forward)

    R11R12R14R18R9R24

  6. 2028

    Committed: Strategy review (pp.67–68); long-term actions begin, including surge thresholds (13g)

    Align: R3 (set the cycle); R8 and R9 (planning-basis annex); R5 (consultation with response note)

    R3R8R9R5

Sources: UK strategy pp.62–68; Part 2 watch list; src/delivery.ts; H5N1 stress test for R21–R23; UK model run (opens in a new tab) for R24.

Limitations

Full brief and sources

The brief cites the UK strategy by printed page and links every comparison to its source part.